Home page seller financing private mortgages owner financing
 Sell Mortgage, Real Estate Investment, Seller Financing,
Private Mortgage Investment, Discounted Mortgage,
Hard Money Mortgage, Sub Prime Mortgage, Credit Report

Place/View Listings: Sell Mortgage • Mortgage Wanted • Get Mortgage • Note Brokers • Mortgage Brokers • Lenders   Home   Bookstore Site Index

Courtesy of mortgage-investments.com. © 2002

  GENERAL SUMMARY
ITEM I
  DESCRIPTION
  COST
1
  Preliminary Expenses
 
  2
  Clearing, Layout, and Excavation
 
  3
  Foundation Wall and Backfill
 
  4
  Reinforcing Steel
 
  5
  Concrete
 
  6
  Lumber
 
  7

  Mason
 
  8
' Plumbing  
  9 Heating and Cooling System
 
  10 Electrical
 
  11 Special Equipment
 
  12 Windows and Glazing
 
  13 Insulation and Soundproofing
 
  14 Dry-Wall and Plaster
 
  15 Ceramic Tile and Marble
 
  16 Flooring
 
  17 Ceilings
 
  18 Overhead Door
 
  19 Structural Steel and Ornamental Iron
 
  20 Roofing and Gutters
 
  21 Trim and Hardware
 
  22 ' Cabinets
 
  23 Decoration
 
  24 ; Cleanup and Landscape
 
   

  25 Miscellaneous
 
   
 
   
   
 
  TOTAL
 

  1. PRELIMINARY EXPENSES
ITEM  
  DESCRIPTION
  COST
  Financing
  Appraisal Fee
 
 
  Origination Fee
 
 
  Inspection Fee
 
 
  Attorney's Fee
 
 
  Recording Fee
 
 
  Stamps (Documentary)
 
 
  Stamps (Tax)
 
 
  Surve
 
 
  Title Examination
  Plans
   
  Permits
   

   
  Insurance


  Bond
   
   
  Liability

   
 
 
  Risk (Builder's)
 
  Utilities
  Water Connection
 
 
  Water Service
 
 
  Sewer Connection
 
 
  Sewer Service
 
 
  Electric Connection
 
 
  Electric Service
 
 
  Telephone Service
 
  Other
   
     
     
     
     
     
     
TOTAL  
  PRELIMINARY EXPENSES
 

  2. CLEARING, LAYOUT, AND EXCAVATION
   
  Quantity,
  Unit
  MATERIAL LABOR
ITEM  
  DESCRIPTION
    Unit
  Total Unit
  Total
Clearing            
  Debris

Removal  
           
  Land Fill
 
   
       
Lumber
  Batter Boards
   
       
 
  Stakes
           
Cord I
   
   
       
  Layout
         
I  

  Excavation

   
   
 
   

   
   
TOTAL '  
   
   
   
  TOTAL CLEARING, LAYOUT, AND EXCAVATION
       
3. FOUNDATION WALL AND BACKFILL
  Block
     
   
           
             
           
  Mortar Mix
         
  Sand
           
Termite  

  Protection
           
  Water

Proofing
             
Backfill              
Moisture  

Barrier
             
  Expansion

  Joint
         
   
 
  Bolts

  Anchor
           
Lumber
  Forming
           
               
  TOTAL
             
  TOTAL
  FOUNDATION WALL AND BACKFILL
     
  -

  4. REINFORCING STEEL
       
  MATERIAL
  LABOR
  ITEM
  DESCRIPTION
Quantity  
  Unit
Unit
Total I  
Unit
  Total
  Rods
  Footin
           
   
I  
         
 
  Columns
           
               
 
  Beams
           
             
  Mesh
     
I  
     
  Chairs
             
  Tie Wire
       
I  
   
Stirrups            
             
  TOTAL
             
  TOTAL
  REINFORCING STEEL
   
I I  
 
  5. CONCRETE
Footing        
  I _
I I
  Slab
             
  Beams
             
  Columns
             
  Walls
             
  Walks and

  Patios
             
Drives        
   
   
  Curbs
         
   
   
  D eck
             
               
               
  TOTAL
             
  TOTAL
  CONCRETE
           

  6. LUMBER
    Quantity  
  MATERIAL
  LABOR
ITEM  
  DESCRIPTION
 
  Unit
Unit
  Total
Unit
  Total
Flooring
  Girders
           
 
  Sills
           
 
  Joists and Header
           
 
  Bridging
           
 
  Subfloor
           
             
Exterior
  Walls
  Btm. Plate
   
   
     
 
  Top Plate
           
 
  Headers
           
   
  Beams
           
 
  Studs
           
 
  Furring Strip
           
 
  Sheathing
           
 
  Siding
           
               
Interior
  Walls
  Btm. Plate
           
 
  To Plate
           
 
  Headers
           
 
  Studs
           
               
Roofing  
  Beams
           
 
  Trusses
           
 
  Rafters
           
               
 
  Joists
           
 
  Ridge
           
 
  Backing
           
  SUBTOTAL
  LUMBER
           

  6. LUMBER (PAGE TWO)
    Quantity  
  MATERIAL
  LABOR
  ITEM
  DESCRIPTION
 
  Unit
  Unit
  Total
  Unit
  Total
SUBTOTAL '  
  (From page one- LUMBER)
           
 
  Sheathing
           
 
  Purlins
           
   
       
   
   
  Eave

  Detail
  Fascia I
   
   
       
 
  Drip nailer
         
 
  Soffit
           
   
  Vents
   
   
     
 
  Frieze
   
         
   
  Molding
     
 
  Backing
   
 
   
         
  Ceiling
I Exterior    
   
 
  Drop
   
   
 
  Soffit
   
   
   
         
   
   
  Gable

  Detail
  Siding
         
   
 
  Molding
           
 
  -

  Vents
       
   
   
  Post
             
Beams              
  Stairway
  Stringer
           
 
  Treads and Landing
           
  Decking
  Beams and Joists
           
 
  Flooring
       
   
   
Other              
  TOTAL
             
  TOTAL
  LUMBER
           

  7. MASONRY
       
  MATERIAL
  LABOR
  ITEM
  DESCRIPTION
Quantity
  Unit
  Unit
  Total
  Unit
  Total
  Block
             
   
             
               
               
               
               
Lintels              
  Sills
       
   
   
  Sill Paper
             
  Steps
             
  Brick
             
  Stone
             
  Mortar Mix
     
   
     
  Sand
             
  Wall Ties
             
  Reinforcing
           
   
  Fireplace
             
               
             
   
               
               
               
               
               
               
               
  TOTAL
             
  TOTAL
  MASONRY
           

8. PLUMBING  
ITEM  
  DESCRIPTION
  COST
Contract    
  Septic Tank
   
  Well
   
  Pum
   
  Other
   
  TOTAL
  PLUMBING
 
9. HEATING AND COOLING SYSTEM
  Contract
   
  Other
   
 
  TOTAL
  HEATING AND COOLING SYSTEM
 
10. ELECTRICAL  
Contract  
   
 
Fixtures  
   
Intercom  
   
Security  
   
  Chimes
   
  TOTAL
  ELECTRICAL
 
  11. SPECIAL EQUIPMENT
Kitchen  
  Range ,
 
 
  Dishwasher
 
 
  Disposal
 
 
  Refrigerator
 
 
  Oven
 
 
  Ventilating Hood
 
 
  Central Cleaning
 
  TOTAL
  SPECIAL EQUIPMENT
 

  12. WINDOWS AND GLAZING
ITEM  
  DESCRIPTION
  COST
  Windows
   
     
     
     
  Doors
   
     
Glazing  
   
Mirrors  
   
Enclosures    
  Other
   
     
  TOTAL
  WINDOWS AND GLAZING
 
13. INSULATION AND SOUNDPROOFING
  Walls
   
Ceiling  
   
  Other
   
  TOTAL
  INSULATION AND SOUNDPROOFING
 
14. DRY-WALL AND PLASTER
  Exterior

  Walls
   
Interior  

  Walls
   
     
     
     
     
     
     
  TOTAL
  DRY-WALL AND PLASTER
 

  15. CERAMIC TILE AND MARBLE
ITEM  
  DESCRIPTION
  COST
  Floors
   
     
  Walls
   
     
  Sills
   
  Other
 
  TOTAL
  CERAMIC TILE AND MARBLE
 
  16. FLOORING
  Vinyl
 
Carpet  
 
  Wood
   
Other  
   
  TOTAL
  FLOORING
 
  17. CEILINGS
  Suspended
  Acoustical
 
 
  Luminous
 
 
  Moldin
 
 
  Tees (Main)
 
 
  Tees (Cross)
 
Other  
   
  TOTAL
  CEILINGS
 
  18. OVERHEAD DOOR
Garage  
   
Openers    
Other  
   
  TOTAL
  OVERHEAD DOOR
 

  19. STRUCTURAL STEEL AND ORNAMENTAL IRON
       
  MATERIAL
  LABOR
ITEM  
  DESCRIPTION
  Quantity
  Unit
Unit
  Total
Unit
  Total
  Steel
  Beams
           
 
  Columns
   
  I
   
  I
f
  Joist
           
I
  Plates
           
 
  Angles
 
  I
       
 
  Stairway
 
  I
       
 
  Rails
           
 
  Door Frames
           
  Other
  `
           
  TOTAL
             
TOTAL !
  STRUCTURAL STEEL AND ORNAMENTAL IRON
           
  20. ROOFING AND GUTTERS
  Felt
  Dry-in
           
Shingles I            
Built-up              
  Gravel

  Stop
       
   
   
  Eave Drip
             
Flashing              
  Vents
             
  Flues
             
Skylight  
 
   
         
  Nails
             
Gutters              
  Downs out
             
  Other
             
  TOTAL
             
  TOTAL
  ROOFING AND GUTTERS
           

  21. TRIM AND HARDWARE
     
  Unit
  MATERIAL
  LABOR
  ITEM
  DESCRIPTION
  Quantity
  Unit
  Total
Unit
  Total
  Door Units
             
               
               
               
               
     
   
       
               
Frames
  Exterior
     
   
 
         
   
 
 
  I nterior
   
   

   
   
             
             
               
  Doors
  Exterior
           
       
   
     
               
 
  Interior
           
               
               
               
             
   
 
  Bifold
           
               
   
   
   
   
     
 
  Pocket
           
               
               
[ SUBTOTAL
  TRIM AND HARDWARE
           

  21. TRIM AND HARDWARE (PAGE TWO)
   
   
 
  MATERIAL
  LABOR
ITEM  
  DESCRIPTION
Quantity
  Unit
Unit
  Total
Unit
   
  Total
  SUBTOTAL
  (From page one-TRIM AND HARDWARE)
           
  Molding I
  Casing
           
 
  Crown
           
 
  Corner
           
 
  Stop
           
 
  Base
   
   
     
 
  Shoe
           
             
   

Paneling  
           
Spindles  
 
   
       
   

  Stairway Risers
           
  Ballusters
           
  Hand Rail
           
  Disappearing
           
Shelving  
           
  Lock Sets Exterior
           
  Interior
           
  i
           
             
   

   

   
           
  Door

  Accessories Threshold
           
 
   

  Hin es
           
 
  Weatherstripping
           
 
  Bumpers
           
  Closet

  Rods
             
  Other
             
  TOTAL
   
           
  TOTAL
  TRIM AND HARDWARE
           

  22. CABINETS
ITEM  
  DESCRIPTION
  COST
Kitchen  
  Base
   
     
     
     
 
  Wall
 
 
   
 
     
 
   
 
 
  Trim
 
   
 
  Countertops
 
 
   
 
  Baths
  Vanities
 
     
 
  Countertops
 
     
 
  Medicine
<